Construction Industry Sub-Contract – Lump Sum Payment on Completion

A full, Construction Act compliant sub-contract for short trade packages lasting less than 45 days, paid in a single lump sum on completion – with payment and pay less notices, CIS, reverse charge VAT, CDM and building safety duties built in.

Editable Word document
35
10pages
Guidance notes included
aml consultancy solutions

Construction & trades

Construction Industry Sub-Contract – Lump Sum Payment on Completion

About this document

What it’s for

A complete sub-contract between a main contractor (or builder) and a sub-contractor for a short, well-defined package of work paid in one lump sum after completion. It contains a payment mechanism that complies with the Construction Act and the Scheme for Construction Contracts, together with CIS, VAT reverse charge, CDM 2015, Building Regulations dutyholder, variation, delay, defects, insurance, termination and adjudication terms.

When to use it

  • Packages expected to take fewer than 45 days, such as a roof covering, a plastering package or a first and second fix on a small job
  • Where a single payment after completion suits both parties
  • Not for longer work – use the instalment or Contractor’s notice versions

What’s inside

The document is laid out in the sections below. Each one comes with a plain-English guidance note explaining what it does and what to change.

  1. Definitions and interpretation
  2. The sub-contract and the main contract
  3. The sub-contract works
  4. Status and the sub-contractor’s workforce
  5. Representatives, programme and time
  6. Sub-contract sum and VAT
  7. Payment
  8. Retention
  9. Construction Industry Scheme
  10. Variations
  11. Delay and extensions of time
  12. Completion and defects
  13. Materials, plant and site rules
  14. Insurance
  15. Liability and indemnities
  16. Termination
  17. Disputes
  18. Notices
  19. General
  20. Governing law and jurisdiction

Also included

  • Schedule 1 – Sub-Contract Particulars
  • Schedule 2 – Sub-Contract Works, documents and attendances
  • Schedule 3 – Payment timetable and Final Application
  • Schedule 4 – Sub-Contractor details, CIS and VAT
  • Schedule 5 – Insurance requirements

How to complete it

  • Complete the Sub-Contract Particulars (Schedule 1), including the estimated duration
  • Describe the work, documents and attendances in Schedule 2
  • Verify the Sub-Contractor for CIS and complete Schedule 4 before paying
  • Diary the payment dates using the timetable in Schedule 3

Key points to check

  • The agreed duration must be under 45 days, or stage payments are required by law
  • Serve every payment notice and Pay Less Notice on time
  • Check the status of the Commercial Payments Bill (retention ban and payment caps)

Our templates are professionally structured starting points for UK businesses, not legal advice. For anything complex, unusual or high-value, have your final version checked by a solicitor.

Included in the pack

Construction & trades

From £29

for every document in this category

Editable Microsoft Word files

Guidance notes in every document

Written for UK businesses

Download and keep

Get the packSee every document in this pack →

Need more than one category?

Documents All-Access gives you every category for 12 months for £295.

Compare options →

Need it tailored?

We can adapt any template to your business, or write a document from scratch.

Talk to us →